Thursday, February 7, 2008

Does It Snow In Fort Campbell

Cement Plaster Plastering Walls and Ceilings Installing a Ring



If the wall is of recent construction, proceed as follows:

1.Aplique two spots with a trowel plaster so that is positioned vertically relative to each other (see left .)
2.Check with a plumb verticality. 3.Once
dry the plaster, to support rule in the two marks and fill in the gap that remains between the ruler and the wall with plaster (pictured right), repeat the procedure in the rest of the area to overturn every four or five feet and a half, given that we get the rule we use to cover the space between the two. 4.Comenzaremos
rough revoked part of giving the required thickness to fill the revoked the rest of the wall (usually 1.5 cm), leaving a few millimeters, with respect to the splines grososr, who will we get then applying the second layer of fine plaster. 5.Remove
rule and smooth with trowel or trowel. With this operation will have done what is called "splines" which are the guides that will help us for the rest of the plaster. 6.When
the splines are dry, moisten the space between the splines (wall plaster). Reinforce the rule in two of them and fill with plaster the remaining space between rule and wall. 7.Remove

rule and smooth with trowel or trowel, checking frequently with vertical plumb. 8.Raye
surface achieved with the tip of the stirrer before it sets, so that the second coat will bond better. 9.Repita
points e, f and g with the area to withdraw. 10.Deje
dry for at least two hours and apply a second thin layer of plaster, dividing to rule and smoothing with trowel or trowel .


If it comes to plastering a ceiling, the procedure is similar, only giving the first layer of rough plaster, qu should press hard material to get it fixed. The second layer is applied after the first extending well seasoned with a trowel.

0 comments:

Post a Comment